Question 1
The guidance system of a ship is controlled by a computer that has three major modules. In order for the computer to function properly, all three modules must function. Two of the modules have reliabilities of .91, and the other has a reliability of .93.
 

a.What is the reliability of the computer? (Round your answer to 4 decimal places.)

 

b. A backup computer identical to the one being used will be installed to improve overall reliability. Assuming the new computer automatically functions if the main one fails, determine the resulting reliability. (Round your intermediate calculations and final answers to 4 decimal places.)

 

c. If the backup computer must be activated by a switch in the event that the first computer fails, and the switch has a reliability of .98, what is the overall reliability of the system? (Both the switch and the backup computer must function in order for the backup to take over.) (Round your intermediate calculations and final answers to 4 decimal places.)

 

Question 2
Determine the availability for each of these cases:
 

a. MTBF = 48 days, average repair time = 6 days. (Round your answer to 2 decimal places.)

 

b. MTBF = 278 hours, average repair time = 8 hours. (Round your answer to 2 decimal places.)

 

Question 3
A manager must decide between two machines. The manager will take into account each machine’s operating costs and initial costs, and its breakdown and repair times. Machine A has a projected average operating time of 125 hours and a projected average repair time of 4 hours. Projected times for machine B are an average operating time of 55 hours and a repair time of 3 hours. What are the projected availabilities of each machine? (Round your answers to 3 decimal places.)
 

 